項目(mu)名稱 |
橫山(shan)縣(xian)張家洼煤炭實(shi)業有(you)限責任公(gong)司(si)礦(kuang)井安全現狀評價報告 |
||
項目內容(rong) |
橫山(shan)縣張家洼(wa)煤炭實(shi)業有(you)限責(ze)任公司(si)屬民(min)營企業,位于榆林市橫山區城區以北約2km處的夏(xia)州(zhou)辦事處張家洼村,行政(zheng)區(qu)劃隸屬橫山(shan)區(qu)夏(xia)州(zhou)辦事處管轄(xia)。S204省(sheng)道(dao)魚(河(he))~橫(山(shan))~靖(邊)二(er)級公路(lu)從工業場地(di)西側近南(nan)(nan)北(bei)向通(tong)(tong)過(guo),向南(nan)(nan)2km到(dao)達城(cheng)區(qu),G65包(頭)~茂(名)高速(su)公路(lu)從井(jing)田西北(bei)側通(tong)(tong)過(guo),G210國道(dao)、G6521榆(yu)(林)商(洛)從井(jing)田東(dong)北(bei)通(tong)(tong)過(guo),有通(tong)(tong)達路(lu)與其相接;井(jing)田以東(dong)的西(安)~包(頭)鐵路(lu)魚河(he)集裝站距礦井(jing)約(yue)55km,礦區(qu)交通(tong)(tong)較為便(bian)利。 井田(tian)地處陜(shan)北(bei)侏(zhu)羅紀煤田(tian)榆(yu)橫礦區(qu)南(nan)部,井田(tian)范圍(wei)由4個拐點坐標圈定(ding),開采(cai)深度由+833m至+784m標高,批準開采(cai)3號煤(mei)層,井(jing)田南北長約(yue)3.00km,東(dong)西寬約(yue)2.50km,井(jing)田面(mian)積2.9854km2。井田內含煤(mei)地層為侏羅系中統延安組,3號煤(mei)層為區(qu)內唯一可采(cai)煤(mei)層,煤(mei)層(ceng)厚度2.42~2.84m,平均厚度(du)2.57m,埋(mai)深一般為250~300m。 該礦為低瓦斯礦井,3號煤層屬(shu)Ⅱ類自燃煤層,煤塵具有爆(bao)炸危險性,礦井(jing)水文地質類型(xing)中等,地溫正常,無沖擊地壓。 張(zhang)家洼(wa)煤礦(kuang)始建于(yu)1996年(nian)(nian)10月,原設計生產(chan)(chan)規模0.15Mt/a,后提(ti)升為0.30Mt/a,2000年(nian)(nian)8月建成投產(chan)(chan)。2005年(nian)(nian)以來,該礦陸續對井(jing)下排水系統(tong)(tong)、運輸系統(tong)(tong)、供(gong)電系統(tong)(tong)和主通(tong)風機進(jin)行(xing)了技術改造。2013年(nian)(nian),原陜西省煤炭生產(chan)(chan)安(an)(an)全監督管理局以“陜煤局發(fa)〔2013〕15號”文批準(zhun)礦井(jing)核(he)定生產(chan)(chan)能力為0.60Mt/a。2020年(nian)(nian)12月26日(ri),陜西煤礦安(an)(an)全監察局為礦井(jing)頒發(fa)安(an)(an)全生產(chan)(chan)許可證(zheng),證(zheng)書編號:(陜)MK安(an)(an)許證(zheng)字(zi)〔121358〕,有效期(qi)至2024年(nian)(nian)1月15日(ri)。 井田(tian)采用(yong)立井開拓方式。地面(mian)工業場地共布置3條井(jing)(jing)(jing)筒(tong)(tong),分別為(wei)主立(li)井(jing)(jing)(jing)、副立(li)井(jing)(jing)(jing)和(he)回(hui)風(feng)(feng)立(li)井(jing)(jing)(jing)。主立(li)井(jing)(jing)(jing)提升機(ji)房安(an)(an)(an)裝(zhuang)纏繞式(shi)提升機(ji)、井(jing)(jing)(jing)筒(tong)(tong)內裝(zhuang)備1對4.2t箕斗(dou)擔負礦(kuang)井(jing)(jing)(jing)原煤提升任務,兼(jian)進(jin)風(feng)(feng)和(he)安(an)(an)(an)全出(chu)口(kou);副立(li)井(jing)(jing)(jing)提升機(ji)房安(an)(an)(an)裝(zhuang)纏繞式(shi)提升機(ji)、井(jing)(jing)(jing)筒(tong)(tong)內裝(zhuang)備單層(ceng)單車罐籠擔負礦(kuang)井(jing)(jing)(jing)輔助提升任務,兼(jian)進(jin)風(feng)(feng)和(he)安(an)(an)(an)全出(chu)口(kou);回(hui)風(feng)(feng)立(li)井(jing)(jing)(jing)為(wei)礦(kuang)井(jing)(jing)(jing)專用(yong)回(hui)風(feng)(feng)井(jing)(jing)(jing),兼(jian)作(zuo)安(an)(an)(an)全出(chu)口(kou)。全井田劃分(fen)為1個(ge)水平(ping)(ping)開(kai)采,水平(ping)(ping)標(biao)高(gao)+799.0m。井(jing)筒(tong)落底(di)后(hou),向東布(bu)置(zhi)一(yi)盤(pan)區(qu)(qu)三條巷(xiang)(xiang)道,向北布(bu)置(zhi)二(er)盤(pan)區(qu)(qu)三條巷(xiang)(xiang)道,向南布(bu)置(zhi)三盤(pan)區(qu)(qu)三條巷(xiang)(xiang)道。全井(jing)田(tian)劃分(fen)(fen)為3個(ge)盤(pan)區(qu)(qu),分(fen)(fen)別為井(jing)田(tian)中部的一(yi)盤(pan)區(qu)(qu)、井(jing)田(tian)北部的二(er)盤(pan)區(qu)(qu)和井(jing)田(tian)南部的三盤(pan)區(qu)(qu)。其(qi)中一(yi)盤(pan)區(qu)(qu)、二(er)盤(pan)區(qu)(qu)已開(kai)采完畢,現開(kai)采三盤(pan)區(qu)(qu)。礦井(jing)采(cai)用(yong)(yong)中央并列(lie)式(shi)通風(feng)(feng)方(fang)式(shi),抽出式(shi)通風(feng)(feng)方(fang)法,即主(zhu)、副立(li)井(jing)進風(feng)(feng),回(hui)風(feng)(feng)立(li)井(jing)回(hui)風(feng)(feng)。井(jing)下主(zhu)運(yun)(yun)(yun)輸(shu)(shu)采(cai)用(yong)(yong)帶式(shi)輸(shu)(shu)送機(ji)連續運(yun)(yun)(yun)輸(shu)(shu)方(fang)式(shi),輔助運(yun)(yun)(yun)輸(shu)(shu)采(cai)用(yong)(yong)防爆(bao)無軌膠輪車直達(da)運(yun)(yun)(yun)輸(shu)(shu)方(fang)式(shi)。井(jing)下采(cai)煤工作面采用長壁(bi)后退(tui)式綜(zong)合機(ji)械化采煤法,全(quan)部垮落法管理頂(ding)板。現(xian)場勘查時,井(jing)下裝備(bei)1個(ge)綜采(cai)工作面(mian)和1個(ge)綜掘工作面(mian)達到礦井核(he)定(ding)生產能力。截止(zhi)到2023年5月底,礦(kuang)井(jing)保有(you)資源儲(chu)(chu)量11.621Mt,剩余(yu)可采儲(chu)(chu)量2.363M。按礦(kuang)井(jing)核定生產能力0.60Mt/a,儲(chu)(chu)量備用系數取1.3,礦(kuang)井(jing)剩余(yu)服務年限(xian)3.1a。 |
||
項目組長(chang) |
田 昆 |
技術負責人(ren) |
陳迎輝 |
過程控制(zhi)負責人 |
劉 楠 |
報告審核(he)人(ren) |
劉曉(xiao)龍 |
評價報告編制(zhi)人 |
田昆、高健、劉(liu)小新 |
||
現場評價時間 |
2023年7月5~6日 |
||
參與評價工作的(de)安全評價師(shi) |
陳迎(ying)輝、田昆(kun)、高健(jian)、劉小(xiao)新(xin) |
||
參與評(ping)價(jia)工作的(de)注冊安全工程師(shi) |
陳迎(ying)輝、劉(liu)小新(xin) |
||
參與評價工作的技術專(zhuan)家 |
王素珍 |
||
現場工作人員 |
陳迎輝、田昆、高健、常顏薪 |
||
現場工作任務 |
1.收集評價(jia)項目所需的相關資料(liao) 2.對(dui)評價項目(mu)進行地面和井(jing)下各(ge)個生產(chan)系統現場檢(jian)查(cha)及(ji)安全設(she)施勘驗和數據采集 3.對(dui)礦井進行危險有害(hai)因素辨識與分析,提出安(an)全對(dui)策措(cuo)施與整改(gai)建議 4.得出評價結論 |
||
提交報告時(shi)間 |
2023年9月 |
||